Permitted

Permit expediting for Massachusetts residential contractors

Email in. Permit out.

Forward us the signed proposal and the permit is off your plate. We cover requirements, forms, filing, follow-up with the building department, and inspection scheduling. Flat $300–500 per building permit. Nothing to learn, nothing to log into.

business days to file, once paperwork is complete
3
flat per building permit, no subscription
$300–500
business day to hear back from us, every time
1
logins, portals, or software to learn
0

How it works

Forward one email. Everything after that is our job.

  1. You do this

    Forward the signed proposal

    Send the signed job proposal to [email protected]. Include the same PDF, scan, or photo you already have. That's the entire handoff.

  2. We do this

    We build the permit package

    Our AI pipeline works out exactly what your town requires for the scope and fills out the forms. A person runs the zoning check, rounds up the signatures, and reviews every line. The only thing you touch is what needs your signature.

  3. We do this

    Filed within 3 business days

    Once the paperwork is complete, your permit is filed within 3 business days through the town's online portal or by email, whichever your town takes.

  4. We do this

    We chase it home

    We track the review, answer the building department's questions, keep you posted along the way, and book inspections when you need them.

Trust

Built to be trusted with your license

Your license, your say-so

Permits are filed under your CSL with a signed authorization you control. You sign once at onboarding and can revoke it any time, and we confirm your license is current before anything goes to the town.

A person checks every package

Our AI assembles the package fast and files nothing on its own. Nothing goes to the town until a human has reviewed the complete package: forms, zoning, signatures, attachments.

Massachusetts is the whole business

One state code, 351 towns that all do it differently. We keep track of your town’s forms, fees, and quirks so you don’t have to, and every permit we file keeps that knowledge current.

Pricing

One flat price per permit

$300–500

per building permit

  • Simple$300Like-for-like work on standard forms — roofs, siding, windows, decks
  • Standard$400A drawing set to assemble — kitchens and baths with layout changes, interior remodels
  • Complex$500A plot plan or zoning review — additions and structural work

The tier follows what your town requires for the scope, not your project's value, and it's locked when we quote. Pay per permit. No subscription, no monthly minimum, no software seat.

  • Requirements worked out for your town and scope
  • Complete package: forms, zoning check, signatures, attachments
  • Filed within 3 business days of complete docs
  • Building-department questions answered until approval
  • Status updates without being asked
  • Inspections booked when you need them

First permit guaranteed. If we don't perform on your first permit, you don't pay.

Whole jobs quoted straight. Electrical, plumbing, and gas permits are pulled by your licensed subs. We prep a sub's packet for $75–100, or file on their behalf for $150–200 where the sub authorizes us, and track the full set for you either way. You get one invoice for the permit-set total, quoted up front, your subs never pay us. Never a surprise multiple.

The town's fee is the town's fee. Municipal permit fees pass through at cost itemized separately on the quote and invoice, never marked up. Your quote states both numbers up front.

Got a job waiting on a permit?

Tell us about it today and it's filed within 3 business days of complete paperwork while your crew stays on the tools.